A single-floor hardwood installation with site finishing typically takes two to four weeks; stone and large-format tile, one to three weeks per area depending on layout complexity and setting method. Material lead times and cure times set that pace more often than labor does, which is why selections are finalized before anything is ordered. You receive a written schedule with milestone dates before we begin, and we hold to one project at a time.
Substrate and preparation
Slab-on-grade homes across North Dallas move, and post-tension slabs need to be read before anything is fastened or cored. We grind and patch to flatness tolerance, moisture-test, and install uncoupling or crack-isolation membranes under stone and tile so a hairline in the slab does not become a crack in your floor.
Living in the house
Dust barriers seal the work area and pathways are protected from the front door inward. Site finishing means a short stretch of restricted access while coats cure, and we sequence rooms so you keep a usable path through the house. Materials are staged outside your living space, and the site is swept at the end of every day.
Investment, in writing
Your scope of work is documented and signed before we start, so the figure does not drift. Preparation, transitions, base and shoe replacement, and haul-away are written in rather than added later. Installation and finish work are covered by a written workmanship warranty handed over at the final walkthrough.