A primary bath typically takes five to nine weeks on site; a powder room, three to five. Labor is rarely what sets that pace — tile and stone lead times, custom glass, and vanity fabrication do, which is precisely why selections are finalized before a wall is opened. You receive a written schedule with milestone dates before demolition, and we hold to one project at a time so momentum never leaves your house for someone else's.
Permits and architectural review
Replacing finishes in place is straightforward. Relocating a drain, adding circuits, or taking down a wall is permitted work, and we handle those filings with the City of Dallas and neighboring municipalities. In Highland Park, University Park, Preston Hollow, and similar communities we prepare architectural review submittals ourselves.
Living in the house
Dust barriers seal the work area, floors and pathways are protected from the front door inward, and materials are staged outside your living space. If the bath under renovation is the only one in the house, we sequence the trades to shorten the stretch it is out of service. The site is swept and staged at the end of every working day.
Investment, in writing
Your scope of work is documented and signed before demolition, so the figure does not drift. Full primary bath renovations at this level of finish generally fall between roughly $35,000 and $110,000 depending on size, stone and tile selection, the fixture package, and whether plumbing moves; hall and powder baths sit considerably below that. Waterproofing and finish work are covered by a written workmanship warranty handed over at the final walkthrough.